bild
SCHWEIZ NEAT CENERI BASISTUNNEL TESTFAHRT
A train drives through the Ceneri Base Tunnel (CBT) on the occasion of a test drive, on Tuesday, 1 September 2020, near Bellinzona. The Ceneri Base Tunnel will be officially opened next Friday after twelve years of construction. The tunnel is composed of two single-track tunnels, each 15.4 km long. (KEYSTONE/Ti-Press Alessandro Crinari)
Instruktionen
Lizenz
Rights Managed
Erstellungsdatum
20200902
Ort
BELLINZONA SCHWEIZ
Credit
KEYSTONE
Source
KEYSTONE/TI-PRESS
Byline
ALESSANDRO CRINARI
Grösse
5458 x 3639 px
Dateityp
JPEG