bild
SCHWEIZ NEAT CENERI BASISTUNNEL BAUSTELLE
New railway viaducts which lead to the Ceneri Base Tunnel, pictured in Camorino, Canton of Ticino, Switzerland, on February 22, 2017. The 15.4-kilometers-long Ceneri Base Tunnel is Switzerland's second largest tunnel-construction project. It passes under the Monte Ceneri Mountain and links Camorino (north) and Vezia (south). Together with the Gotthard Base Tunnel which opened in 2016, it forms the heart of the «New Railway Link through the Alps NRLA». The two Base Tunnels create a continuous flat north-south route. The Ceneri Base Tunnel is scheduled to be opened and become operational in 2020. (KEYSTONE/Gaetan Bally)
Instruktionen
Lizenz
Rights Managed
Erstellungsdatum
20170222
Ort
CAMORINO SCHWEIZ
Credit
KEYSTONE
Source
KEYSTONE
Byline
GAETAN BALLY
Grösse
6720 x 4480 px
Dateityp
JPEG