image
People pictured from a train during a media orientation on the test operation of the Gotthard Base Tunnel in Erstfeld in the Canton of Uri, Switzerland, on March 10, 2016. The Gotthard Base Tunnel consists of two 57-kilometres-long single-track tubes. It joins the north portal in Erstfeld with the south portal in Bodio. On January 16, 2016, SBB Cargo took up test drives with cargo trains for AlpTransit, the owner. The tests will continue until the end of May 2016, the inauguration of the Gotthard Base Tunnel takes place on June 1, 2016, and the tunnel will be taken into regular operation in December of 2016. (KEYSTONE/Christian Beutler) Menschen an der Medienorientierung zum Testbetrieb des Gotthard-Basistunnels, aufgenommen am Donnerstag 10. Maerz 2016 in Erstfeld. Der Gotthard-Basistunnel besteht aus zwei 57 km langen Einspurroehren. Er verbindet das Nordportal in Erstfeld mit dem Suedportal in Bodio. Am 16. Januar 2016 fuehrte SBB Cargo im Rahmen des Testbetriebs der Bauherrin AlpTransit Gotthard AG die ersten Gueterzuege durch den neuen Gotthard-Basistunnel. Der Testbetrieb dauert bis Ende Mai 2016, die Eroeffnung des Gotthard-Basistunnels findet am 1. Juni 2016 statt, fahrplanmaessig geht er im Dezember 2016 in Betrieb. (KEYSTONE/Christian Beutler)