image
SCHWEIZ LEVENTINA SBB BETRIEBSZENTRALE
The drilling head of the tunnel drilling machine used during the tunneling of the Gotthard Base Tunnel, front, and the Swiss Federal Railway's operations center, in the back, in Pollegio in the Leventina valley in the Canton of Ticino, Switzerland, on the June 16, 2016. The drilling head is located nin Pollogio. (KEYSTONE/Christian Beutler) Der Bohrkopf der Tunnelbohrmaschine, die beim Gotthard Basistunnel Tunnelbau verwendet wurde, Vordergrund, die SBB Betriebszentrale, im Hintergrund, in Pollegio in der Leventina im Kanton Tessin am 15. Juni 2016. (KEYSTONE/Christian Beutler)
Instructions
License
Rights Managed
Date created
20160615
Place
LEVENTINA SCHWEIZ
Credit
KEYSTONE
Source
KEYSTONE
Byline
CHRISTIAN BEUTLER
Size
7360 x 4912 px
File type
JPEG