bild
SCHWEIZ NEAT CENERI BASISTUNNEL BAUARBEITEN
Construction work in the west tunnel of the Ceneri Base Tunnel between Camorino and Vezia, canton of Ticino, Switzerland, pictured on July 13, 2016. The 15.4-kilometers-long Ceneri Base Tunnel is Switzerland's second largest tunnel-construction project. It passes under the Monte Ceneri Mountain and links Camorino (north) and Vezia (south). Together with the Gotthard Base Tunnel which opened 2016, it forms the heart of the «New Railway Link through the Alps NRLA». The two Base Tunnels create a continuous flat north-south route. The Ceneri Base Tunnel is scheduled to be opened and become operational in 2020. (KEYSTONE/Gaetan Bally)
Instruktionen
Lizenz
Rights Managed
Erstellungsdatum
20160713
Ort
MONTE CENERI TUNNEL SCHWEIZ
Credit
KEYSTONE
Source
KEYSTONE
Byline
GAETAN BALLY
Grösse
5792 x 8688 px
Dateityp
JPEG