image
Railway tracks near the northern portal of the Gotthard Base Tunnel, taken on February 6, 2016 in Erstfeld, Canton of Uri. The Gotthard Base Tunnel consists of two 57-kilometres-long single-track tubes. It joins the north portal at Erstfeld to the south portal at Bodio. On January 16, 2016, SBB Cargo took up test drives with cargo trains for the building owner AlpTransit. The tests will continue to the end of May 2016, the inauguration of the Gotthard Base Tunnel takes place on June 1st, 2016, and the tunnel will be taken in regular operation in December 2016. (KEYSTONE/Gaetan Bally) Eisenbahnschienen vor dem Nordportal des Gotthard-Basistunnels, aufgenommen am 6. Februar 2016 in Erstfeld, Kanton Uri. Der Gotthard-Basistunnel besteht aus zwei 57 km langen Einspurroehren. Er verbindet das Nordportal in Erstfeld mit dem Suedportal in Bodio. Am 16. Januar 2016 fuehrte SBB Cargo im Rahmen des Testbetriebs der Bauherrin AlpTransit Gotthard AG die ersten Gueterzuege durch den neuen Gotthard-Basistunnel. Der Testbetrieb dauert bis Ende Mai 2016, die Eroeffnung des Gotthard-Basistunnels findet am 1. Juni 2016 statt, fahrplanmaessig geht er im Dezember 2016 in Betrieb. (KEYSTONE/Gaetan Bally)